Metal Hook for release system
This is the hook belonging to the release system
Instructions for use
- Hang the distribution point on the metal structure (option a) or on the pillars of the greenhouse (option b), using adhesive tape. Make sure that the distribution point does not come into contact with the vegetation. Install a distribution point every 200m2 and avoid the edges and doors of the greenhouse.
- Clamp the tube at the distribution point. Add a new tube every two weeks (BASILcontrol, VERDAcontrol, ORNAcontrol) or three weeks (FRESAcontrol and BERRYcontrol).