Built in the Netherlands, ready for Tunisia 

Reliable water management for tomato cultivation in a desert environment

Philip van Antwerpen, Managing Director Agro Care Tunisia
Agro Care is developing Hicha Joy in Tunisia into a large-scale tomato greenhouse facility in a desert environment. That makes reliable water management essential. Since 2023, Royal Brinkman has supplied several custom-built water units for Agro Care’s phased expansion: from dosing units and drip units to drain, condensate and clean water units.  

Each unit is engineered, built and tested in the Netherlands, so Agro Care’s own technical team can install and connect it directly to the greenhouse system on site. Together, these water installations help each new section of Hicha Joy come into operation at the right moment, supporting Agro Care’s ambition to grow towards 120 hectares.
Agro Care Tunisia in short 
Agro Care is an international tomato grower with strong roots in the Netherlands and a clear pioneering mindset. The company grows tomatoes for the European retail market and combines large-scale production with attention for people, nature and reliable year-round supply. 

Since 2012, Agro Care has also been active in Tunisia. At Desert Joy (40 hectares), near El Hamma on the edge of the Sahara, the company uses the favourable climate and natural light to grow tomatoes during the winter months. With Hicha Joy, Agro Care is taking the next step in Tunisia. Hicha Low is already fully in production, covering 60 hectares. Hicha High is being developed in phases: the first 15 hectares are in production, another 15 hectares is near completion, and the final 30 hectares will be built in the next phase. Together, this brings the Hicha Joy location to 120 hectares. 
Philip van Antwerpen, Managing Director Agro Care Tunisia
Philip van Antwerpen, Managing Director Agro Care Tunisia

"Royal Brinkman has the same ambition as we do. For us, the cooperation is based on trust, personal contact and a willingness to improve together.” 

- Philip van Antwerpen, Managing Director Agro Care Tunisia 
Reliable water units for phased growth 
At Hicha Joy in Tunisia, Agro Care is expanding its greenhouse facility section by section. Each new phase calls for reliable water units that fit seamlessly into the greenhouse systems. By delivering the units step by step, Royal Brinkman helps ensure that the water management is ready to perform when each new section comes into operation. 

Philip van Antwerpen: “The cooperation with Royal Brinkman started after a personal conversation with Bas Brinkman. Agro Care recognised the same practical mindset: the drive to keep improving every day and to build solutions that work in practice.” That mindset still defines the cooperation.
Philip and Stefan
Philip van Antwerpen & Stefan Bron
Custom-built water units for Agro Care 
Stefan Bron, Sales Manager Technical Projects at Royal Brinkman: “Each water unit is custom-built to meet Agro Care’s requirements. CombiCoop supplies the 3D drawing. Based on this drawing, we build the units with great precision in the technical workshop in ’s-Gravenzande.”  

Stefan continues: “At Agro Care’s request, the control panels are equipped with a closed cooling system.” No outside air is needed to cool the panels. This helps keep heat and contamination out, which contributes to reliable operation in the Tunisian climate.

"With every new technical installation, we try to do things even better than before. Quality is in the details.”  

- Stefan Bron, Sales Manager Tech at Royal Brinkman 
Machines
Dosing unit
Machines
Sieve bent screen
Machines
Water technical room
Installed by Agro Care’s own team 
Once the water units arrive in Tunisia, Agro Care’s own technical team takes over the installation. In Tunisia, Agro Care invests strongly in training and developing its employees. The team learns how to work with the technology and processes of a modern greenhouse operation. That knowledge on site is valuable. Philip says: “I’m very proud of our team who install and maintain the water units.”
Agro Care’s own team

“The units were exactly what we expected. We are very pleased with the result. In fact, our Dutch locations are now ordering these units through Royal Brinkman. That says a lot.” 

- Philip van Antwerpen, Managing Director Agro Care Tunisia 
Water management in the desert 
Water management plays a central role in Agro Care’s operations in Tunisia. The water units are part of a complete water management system. The dosing unit prepares water and fertilisers for the daily irrigation needs of the greenhouses, with a pump capacity of around 100 cubic metres per hour. 

Stefan Bron explains: “The drip units supply the irrigation system in the greenhouse. The drain unit collects drain water and pumps it back into the system. This allows Agro Care to reuse water and make efficient use of every available water source.”

Agro Care is also taking the next step in water conservation. Philip van Antwerpen: "We are building a filtration system that will make it possible to use seawater for irrigation instead of groundwater.”
Overview
Agro Care’s water filtration project
Overview
Agro Care’s Hicha Joy location
Team
The Agro Care team
Built in the Netherlands, ready for Tunisia 
From customer drawing to ready-to-install water unit 
In Royal Brinkman’s workshop in ’s-Gravenzande, each water unit is built around Agro Care’s requirements and technical drawings. The unit must not only be technically correct, but also practical to install in Tunisia. That means every choice in design, assembly and testing is made with the final installation on site in mind. 

Technical Engineers Arek Lysiak and Thomas Kolp explain how that works in practice. From checking the design and preparing the materials to building, testing and preparing the unit for transport. Step by step, the team works towards a complete water unit that is ready for installation by Agro Care’s own technical team.  
From 3D drawing to buildable design 
The process starts with the technical design. CombiCoop supplies the 3D drawing, which forms the basis for the water unit. Royal Brinkman reviews this drawing together with CombiCoop and aligns the technical details before construction begins. 

During this phase, the teams look at the layout, the available space and the technical requirements. Any possible challenges are discussed early on. Once the design is finalised, the frames and materials are ordered. 

When the materials arrive in the workshop, everything is carefully checked and sorted. This gives the team a clear overview and helps them work efficiently during assembly. 
Thomas
Thomas Kolp, Technical engineer

“Arek and I work well together and build the units as a team from design to final delivery.” 

- Thomas Kolp, Technical Engineer at Royal Brinkman 
Building the units, step by step 
Thomas Kolp, Technical Engineer at Royal Brinkman, explains: “Each unit has two technical sides: a water-technical side and an electrical side. We always start with the water side. First, the main piping is installed, including pumps and filters. Then the smaller components are added, such as sensors and connections.” 

Thomas continues, “After that, the electrical panels are placed. These determine the layout of the cable trays. The electrically controlled components are then connected step by step.” Arek Lysiak adds, “No two units are the same. Every installation is unique and fully customised, which makes the work both challenging and rewarding.”

“It’s really satisfying when everything comes together perfectly in the end.”  

- Thomas Kolp, Technical Engineer at Royal Brinkman 
Tested, documented and ready for transport 
Thomas Kolp, Technical Engineer at Royal Brinkman, explains: “Each unit has two technical sides: a water-technical side and an electrical side. We always start with the water side. First, the main piping is installed, including pumps and filters. Then the smaller components are added, such as sensors and connections.” 

Thomas continues, “After that, the electrical panels are placed. These determine the layout of the cable trays. The electrically controlled components are then connected step by step.” Arek Lysiak adds, “No two units are the same. Every installation is unique and fully customised, which makes the work both challenging and rewarding.”
Machine
Drip unit in the Royal Brinkman workshop
Machine
Drip unit in the Royal Brinkman test room
Inside
Hicha Joy’s technical team
Growing into the future together 
The water units for Agro Care Tunisia show how technology, cooperation and local knowledge strengthen each other. Royal Brinkman brings technical expertise in water management and custom-built systems. Agro Care brings local experience, ambition and a strong team on site. 

Together, these elements form the basis for a reliable water management system that supports Agro Care’s growth in Tunisia.  

“Together with Royal Brinkman, we will grow into the future.” 

- Philip van Antwerpen, Managing Director Agro Care Tunisia 
Written on August 26, 2026
Do you have a question?
Do not hesitate to ask your questions to our specialist using the form. We will respond to your questions as soon as possible.
Built in the Netherlands, ready for Tunisia

Reliable water management for tomato cultivation in a desert environment

Philip van Antwerpen, Managing Director Agro Care Tunisia
Agro Care is developing Hicha Joy in Tunisia into a large-scale tomato greenhouse facility in a desert environment. That makes reliable water management essential. Since 2023, Royal Brinkman has supplied several custom-built water units for Agro Care’s phased expansion: from dosing units and drip units to drain, condensate and clean water units.  
Each unit is engineered, built and tested in the Netherlands, so Agro Care’s own technical team can install and connect it directly to the greenhouse system on site. Together, these water installations help each new section of Hicha Joy come into operation at the right moment, supporting Agro Care’s ambition to grow towards 120 hectares.
Agro Care Tunisia in short 
Agro Care is an international tomato grower with strong roots in the Netherlands and a clear pioneering mindset. The company grows tomatoes for the European retail market and combines large-scale production with attention for people, nature and reliable year-round supply. 

Since 2012, Agro Care has also been active in Tunisia. At Desert Joy (40 hectares), near El Hamma on the edge of the Sahara, the company uses the favourable climate and natural light to grow tomatoes during the winter months. With Hicha Joy, Agro Care is taking the next step in Tunisia. Hicha Low is already fully in production, covering 60 hectares. Hicha High is being developed in phases: the first 15 hectares are in production, another 15 hectares is near completion, and the final 30 hectares will be built in the next phase. Together, this brings the Hicha Joy location to 120 hectares. 
Philip van Antwerpen, Managing Director Agro Care Tunisia
Philip van Antwerpen, Managing Director Agro Care Tunisia
“Royal Brinkman has the same ambition as we do. For us, the cooperation is based on trust, personal contact and a willingness to improve together.” 
- Philip van Antwerpen, Managing Director Agro Care Tunisia 
Reliable water units for phased growth 
At Hicha Joy in Tunisia, Agro Care is expanding its greenhouse facility section by section. Each new phase calls for reliable water units that fit seamlessly into the greenhouse systems. By delivering the units step by step, Royal Brinkman helps ensure that the water management is ready to perform when each new section comes into operation. 

Philip van Antwerpen: “The cooperation with Royal Brinkman started after a personal conversation with Bas Brinkman. Agro Care recognised the same practical mindset: the drive to keep improving every day and to build solutions that work in practice.” That mindset still defines the cooperation.  
Philip and Stefan
Philip van Antwerpen & Stefan Bron
Custom-built water units for Agro Care 
Stefan Bron, Sales Manager Technical Projects at Royal Brinkman: “Each water unit is custom-built to meet Agro Care’s requirements. CombiCoop supplies the 3D drawing. Based on this drawing, we build the units with great precision in the technical workshop in ’s-Gravenzande.”  

Stefan continues: “At Agro Care’s request, the control panels are equipped with a closed cooling system.” No outside air is needed to cool the panels. This helps keep heat and contamination out, which contributes to reliable operation in the Tunisian climate.
"With every new technical installation, we try to do things even better than before. Quality is in the details.”  
- Stefan Bron, Sales Manager Tech at Royal Brinkman 
Machines
Dosing unit
Machines
Sieve bent screen
Machines
Water technical room
Installed by Agro Care’s own team 
Once the water units arrive in Tunisia, Agro Care’s own technical team takes over the installation. In Tunisia, Agro Care invests strongly in training and developing its employees. The team learns how to work with the technology and processes of a modern greenhouse operation. That knowledge on site is valuable. Philip says: “I’m very proud of our team who install and maintain the water units.”  
Agro Care’s own team
“The units were exactly what we expected. We are very pleased with the result. In fact, our Dutch locations are now ordering these units through Royal Brinkman. That says a lot.” 
- Philip van Antwerpen, Managing Director Agro Care Tunisia 
Water management in the desert 
Water management plays a central role in Agro Care’s operations in Tunisia. The water units are part of a complete water management system. The dosing unit prepares water and fertilisers for the daily irrigation needs of the greenhouses, with a pump capacity of around 100 cubic metres per hour. 

Stefan Bron explains: “The drip units supply the irrigation system in the greenhouse. The drain unit collects drain water and pumps it back into the system. This allows Agro Care to reuse water and make efficient use of every available water source.” 

Agro Care is also taking the next step in water conservation. Philip van Antwerpen: "We are building a filtration system that will make it possible to use seawater for irrigation instead of groundwater.”
Overview
Agro Care’s water filtration project
Overview
Agro Care’s Hicha Joy location
Team
The Agro Care team
Built in the Netherlands, ready for Tunisia 
From customer drawing to ready-to-install water unit 
In Royal Brinkman’s workshop in ’s-Gravenzande, each water unit is built around Agro Care’s requirements and technical drawings. The unit must not only be technically correct, but also practical to install in Tunisia. That means every choice in design, assembly and testing is made with the final installation on site in mind. 

Technical Engineers Arek Lysiak and Thomas Kolp explain how that works in practice. From checking the design and preparing the materials to building, testing and preparing the unit for transport. Step by step, the team works towards a complete water unit that is ready for installation by Agro Care’s own technical team.  
From 3D drawing to buildable design 
The process starts with the technical design. CombiCoop supplies the 3D drawing, which forms the basis for the water unit. Royal Brinkman reviews this drawing together with CombiCoop and aligns the technical details before construction begins. 

During this phase, the teams look at the layout, the available space and the technical requirements. Any possible challenges are discussed early on. Once the design is finalised, the frames and materials are ordered. 

When the materials arrive in the workshop, everything is carefully checked and sorted. This gives the team a clear overview and helps them work efficiently during assembly. 
Thomas
Thomas Kolp, Technical engineer
“Arek and I work well together and build the units as a team from design to final delivery.” 
- Thomas Kolp, Technical Engineer at Royal Brinkman 
Building the units, step by step 
Thomas Kolp, Technical Engineer at Royal Brinkman, explains: “Each unit has two technical sides: a water-technical side and an electrical side. We always start with the water side. First, the main piping is installed, including pumps and filters. Then the smaller components are added, such as sensors and connections.” 

Thomas continues, “After that, the electrical panels are placed. These determine the layout of the cable trays. The electrically controlled components are then connected step by step.” Arek Lysiak adds, “No two units are the same. Every installation is unique and fully customised, which makes the work both challenging and rewarding.”
“It’s really satisfying when everything comes together perfectly in the end.”  
- Thomas Kolp, Technical Engineer at Royal Brinkman 
Tested, documented and ready for transport 
Before the unit leaves the workshop, it is thoroughly tested. The team checks whether all components function correctly. The system is also tested for watertightness. In addition, the frequency controllers are fine-tuned for optimal performance. 

Arek Lysiak: “During assembly, we pay close attention to the technical and visual finish.” Thomas Kolp continues: “The goal is clear: the water and electrical installations must be built correctly and meet the customer’s requirements.” 

Once everything works as it should, the unit is prepared for transport. The required documentation is added, and the units are carefully packaged. Then it is ready to be shipped to Tunisia, where Agro Care’s own technical team connects the units to the greenhouse system.  
Machine
Drip unit in the Royal Brinkman workshop
Machine
Drip unit in the Royal Brinkman test room
Machine
Hicha Joy’s technical team
Growing into the future together 
The water units for Agro Care Tunisia show how technology, cooperation and local knowledge strengthen each other. Royal Brinkman brings technical expertise in water management and custom-built systems. Agro Care brings local experience, ambition and a strong team on site. 

Together, these elements form the basis for a reliable water management system that supports Agro Care’s growth in Tunisia. 
“Together with Royal Brinkman, we will grow into the future.” 
- Philip van Antwerpen, Managing Director Agro Care Tunisia 
Written on August 26, 2026
Do you have a question?
Do not hesitate to ask your questions to our specialist using the form. We will respond to your questions as soon as possible.
Stefan Bron